Veris-technologies Quad 1000 Soil EC Mapping System - Operating Instr Manuale Utente Pagina 22

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 43
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 21
OM17-Quad1000
6-1
Section 6
Maintenance and Service
Procedure #1: EC Surveyor Instrument Signal Testing
Perform this test daily or every 10 hours of data collection to ensure you are obtaining reliable
data, and whenever EC data is questionable. The purpose of this test is to insure that the
instrument is performing properly.
The EC Surveyor is shipped with an Instrument Test Load (Part No. 10447) that will enable you
to quickly check the instrument to ensure that it is functioning properly. To perform this test:
1) Disconnect the signal cable from the signal terminal on the EC Surveyor.
2) Connect the test load to the signal terminal.
3) Switch on the EC Surveyor and view display.
4) The display should show:
Shallow: 14
Deep: 21
5) If the readings vary significantly (more than one whole number) contact Veris service
department.
6) Once the test is complete, remove the test load and reinstall the implement signal cable.
Figure 1.1 Signal Test Load installed (display showing proper EC readings for Quad1000)
Signal Test Load
Vedere la pagina 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 42 43

Commenti su questo manuale

Nessun commento